Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Astros Notes: Outfield, Rotation, Pearson

    March 4, 2026

    Destination X: Season Two Filming Underway; NBC Renews Travel Competition Series – canceled + renewed TV shows, ratings

    March 4, 2026

    Exclusive: The Independents Acquires Ma+Group

    March 4, 2026
    Facebook X (Twitter) Instagram
    Select Language
    Facebook X (Twitter) Instagram
    NEWS ON CLICK
    Subscribe
    Wednesday, March 4
    • Home
      • United States
      • Canada
      • Spain
      • Mexico
    • Top Countries
      • Canada
      • Mexico
      • Spain
      • United States
    • Politics
    • Business
    • Entertainment
    • Fashion
    • Health
    • Science
    • Sports
    • Travel
    NEWS ON CLICK
    Home»Sports»US Sports»Quinn Priester Slightly Behind Schedule
    US Sports

    Quinn Priester Slightly Behind Schedule

    News DeskBy News DeskMarch 4, 2026No Comments3 Mins Read
    Share Facebook Twitter Pinterest Copy Link LinkedIn Tumblr Email VKontakte Telegram
    Quinn Priester Slightly Behind Schedule
    Share
    Facebook Twitter Pinterest Email Copy Link

    Brewers starter Quinn Priester may be facing a season-opening injured list stint. Manager Pat Murphy told reporters that the righty is slightly behind schedule in his buildup and isn’t a lock for Opening Day (link via Curt Hogg of The Milwaukee Journal-Sentinel).

    Priester battled wrist soreness at the end of last season. He avoided an IL stint and was healthy enough to make two playoff appearances (albeit with poor results). The team and pitcher decided to take things a little slower than usual over the offseason to reduce the risk of the wrist flaring back up. He’s throwing but hasn’t made any appearances this spring.

    There’s minimal concern about this being a long-term issue. Priester seems likely to get some game reps before camp is finished. He might not have time to build into a starter’s workload within the next three weeks, though. A season-opening injured list stint would allow them to send him to the minors for a rehab start or two if he’s not completely ready. He’d only miss two turns through the rotation if he has a minimal IL stay.

    Milwaukee acquired Priester in a mid-April trade with the Red Sox a year ago. The former first-round pick had fallen down Boston’s depth chart. Milwaukee plugged him directly into a big league rotation that was struggling with injury. Priester ran with the opportunity, pitching to a 3.32 ERA across 157 1/3 innings. His strikeout and walk profile was more solid than great, but the sinkerballer got grounders at a 56.1% clip. He allowed three runs or fewer in all but four of his 29 appearances.

    Brandon Woodruff is also questionable for the start of the regular season after last year’s lat strain. The two-time All-Star has a better shot of starting the season on the active roster than Priester does. Woodruff has thrown batting practice and is scheduled to make his Cactus League debut on Saturday, Hogg writes.

    Woodruff would be the obvious choice to start on Opening Day if he’s sufficiently stretched out. Jacob Misiorowski is the only other pitcher who seems locked into the season-opening rotation. The flamethrower made his Spring Training debut this afternoon against Great Britain in a World Baseball Classic exhibition; he tossed 38 pitches and struck out five over two innings.

    Logan Henderson, Robert Gasser, Chad Patrick and trade pickups Brandon Sproat and Kyle Harrison are all competing for rotation roles. Milwaukee will rely heavily on one of the deeper bullpens in the league and should be aggressive in shuttling pitchers back and forth from the minors. Woodruff and lefty reliever Rob Zastryzny are their only pitchers who can’t be optioned.

    brandon woodruff quinn priester
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Telegram Copy Link
    News Desk
    • Website

    News Desk is the dedicated editorial force behind News On Click. Comprised of experienced journalists, writers, and editors, our team is united by a shared passion for delivering high-quality, credible news to a global audience.

    Related Posts

    US Sports

    Astros Notes: Outfield, Rotation, Pearson

    March 4, 2026
    US Sports

    Tahaad Pettiford, Auburn control second half, dump LSU

    March 4, 2026
    US Sports

    SA vs NZ, T20 World Cup 2026 Semi-Final: Eden Gardens Pitch Report, T20I Stats and Records

    March 4, 2026
    US Sports

    SA vs NZ, T20 World Cup 2026 1st semi-final: Kolkata Weather Forecast and Dew Factor

    March 4, 2026
    US Sports

    Poll: Will Carson Benge Break Camp With The Mets?

    March 4, 2026
    US Sports

    SA vs NZ, T20 World Cup 2026 1st semi-final Match Prediction: Who will win today’s game between South Africa and New Zealand?

    March 4, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Don't Miss

    Astros Notes: Outfield, Rotation, Pearson

    News DeskMarch 4, 20260

    The Astros spent most of the offseason looking to add a left-handed hitting outfielder. That…

    Destination X: Season Two Filming Underway; NBC Renews Travel Competition Series – canceled + renewed TV shows, ratings

    March 4, 2026

    Exclusive: The Independents Acquires Ma+Group

    March 4, 2026

    🎙 PODCAST | El emérito, el expríncipe y la descomposición de un poder anacrónico

    March 4, 2026
    Tech news by Newsonclick.com
    Top Posts

    LISA Flaunts A Confident Smile In New Post Sparking Fan Frenzy And Location Speculation

    February 2, 2026

    TikTok says its services are restored after the outage

    February 2, 2026

    Lauryn Hill Honors D’Angelo & Roberta Flack At The Grammys

    February 2, 2026

    ‘When you can’t beat them, boycott them’: Pakistan’s decision to decline India T20 World Cup 2026 match triggers fan reactions

    February 2, 2026
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    Editors Picks

    Astros Notes: Outfield, Rotation, Pearson

    March 4, 2026

    Destination X: Season Two Filming Underway; NBC Renews Travel Competition Series – canceled + renewed TV shows, ratings

    March 4, 2026

    Exclusive: The Independents Acquires Ma+Group

    March 4, 2026

    🎙 PODCAST | El emérito, el expríncipe y la descomposición de un poder anacrónico

    March 4, 2026
    About Us

    NewsOnClick.com is your reliable source for timely and accurate news. We are committed to delivering unbiased reporting across politics, sports, entertainment, technology, and more. Our mission is to keep you informed with credible, fact-checked content you can trust.

    We're social. Connect with us:

    Facebook X (Twitter) Instagram Pinterest YouTube
    Latest Posts

    Astros Notes: Outfield, Rotation, Pearson

    March 4, 2026

    Destination X: Season Two Filming Underway; NBC Renews Travel Competition Series – canceled + renewed TV shows, ratings

    March 4, 2026

    Exclusive: The Independents Acquires Ma+Group

    March 4, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Facebook X (Twitter) Instagram Pinterest
    • About Us
    • Editorial Policy
    • Privacy Policy
    • Terms and Conditions
    • Disclaimer
    • Advertise
    • Contact Us
    © 2026 Newsonclick.com || Designed & Powered by ❤️ Trustmomentum.com.

    Type above and press Enter to search. Press Esc to cancel.