Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Vinicius Jr rocks new look after chin surgery (yes, it’s really him…)

    July 21, 2026

    Moebius retoma ‘Happily Ever After’ antes del estreno en Toronto – Celebrity Land

    July 21, 2026

    Arizona primaries set the stage for contested fall races in a swing state : NPR

    July 21, 2026
    Facebook X (Twitter) Instagram
    Select Language
    Facebook X (Twitter) Instagram
    NEWS ON CLICK
    Subscribe
    Tuesday, July 21
    • Home
      • United States
      • Canada
      • Spain
      • Mexico
    • Top Countries
      • Canada
      • Mexico
      • Spain
      • United States
    • Politics
    • Business
    • Entertainment
    • Fashion
    • Health
    • Science
    • Sports
    • Travel
    NEWS ON CLICK
    Home»Top Countries»Canada»Saskatoon’s University Bridge reopening postponed, adding $213K to repair costs
    Canada

    Saskatoon’s University Bridge reopening postponed, adding $213K to repair costs

    News DeskBy News DeskJuly 21, 2026No Comments3 Mins Read
    Share Facebook Twitter Pinterest Copy Link LinkedIn Tumblr Email VKontakte Telegram
    Saskatoon’s University Bridge reopening postponed, adding $213K to repair costs
    Share
    Facebook Twitter Pinterest Email Copy Link

    Drivers hoping to use Saskatoon’s University Bridge will have to wait longer, as the city once again pushes back its reopening date to the general public due to construction delays.

    The bridge will remain closed “near term” to non-emergency vehicles as nearby College Drive construction and bridge rehabilitation work continues, the city said in a Friday news release.

    Currently, only emergency vehicles are allowed to use the bridge while construction continues, something the city said remains a “top priority.”

    Saskatoon closed the University Bridge on April 6 for repairs, initially planning to reopen it in June. That timeline was later pushed to mid- to late July because of weather-related construction delays, according to the city.

    The city has revised its opening plan after exploring “multiple options,” said Terry Schmidt, Saskatoon’s transportation and construction manager, in a statement to Global News.

    Story continues below advertisement

    Previously, the bridge was supposed to open to single-lane, two-way traffic. But now the city is waiting for three traffic lanes to become available so one lane can be dedicated to emergency vehicles, said Schmidt.

    Get breaking Canada news delivered to your inbox as it happens so you won't miss a trending story.

    Get breaking National news

    Get breaking Canada news delivered to your inbox as it happens so you won’t miss a trending story.

    Schmidt said this decision came after further review and discussions with emergency services and the Saskatchewan Health Authority (SHA).

    “No one wants to create a scenario where an ambulance, fire truck, or police vehicle is trapped in traffic,” Schmidt said in a statement.

    The Saskatchewan Cancer Agency said in a statement to Global News that its shuttle has permission to use the bridge during the closure and recommends patients plan their trips accordingly.

    The SHA said it has been collaborating with the the city and other stakeholders during the construction to ensure emergency vehicles have access to its facilities.

    “The SHA supports the timely resumption of regular traffic across the bridge and along College Avenue Drive as soon as it is safe to do so, and is working with the city to maintain access for emergency vehicles, while also maintaining reasonable alternative access for all medical services it is safe to do so,” the health authority said in a statement to Global News.


    The city has not provided a new reopening date.

    Additional repairs increase project costs

    The city is also increasing the budget for the University Bridge archway rehabilitation project after discovering more extensive deterioration during an inspection.

    Story continues below advertisement

    The city says crews discovered “greater than anticipated concrete loss” through an inspection when a temporary work platform was installed in early June.

    “The decision was made to proceed with these repairs to take advantage of having the temporary work platform already in place and avoid needing to return to complete these necessary repairs within a few years,” the city told Global News in a statement.

    These additional repairs are expected to increase the project’s cost by $213,000. The cost for the rehabilitation project was originally $1.5 million.

    While the city cannot provide a date for the bridge’s reopening, its website now says it expects archway repairs to be completed by mid- to late September. It remains unclear whether general traffic will be allowed back onto the bridge before rehabilitation work is complete.

    &copy 2026 Global News, a division of Corus Entertainment Inc.

    canada City of Saskatoon SHA University Bridge
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Telegram Copy Link
    News Desk
    • Website

    News Desk is the dedicated editorial force behind News On Click. Comprised of experienced journalists, writers, and editors, our team is united by a shared passion for delivering high-quality, credible news to a global audience.

    Related Posts

    Canada

    Trump’s escalating trade war puts pressure on premiers with U.S. booze bans as they gather in P.E.I.

    July 21, 2026
    Canada

    July 26 — Heart Fit Clinic

    July 21, 2026
    Canada

    Administration recommends Calgary double contribution to Werklund Centre modernization – Calgary

    July 21, 2026
    Canada

    Calgary emergency crews say more water rescue calls coming in 2026 than 2025

    July 21, 2026
    Canada

    Homicide of Edmonton mom and nurse Nadine Robinson unsolved, 20 years later – Edmonton

    July 21, 2026
    Canada

    Enbridge breaks ground on $4B natural gas pipeline expansion

    July 21, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Don't Miss

    Vinicius Jr rocks new look after chin surgery (yes, it’s really him…)

    News DeskJuly 21, 20260

    Real Madrid winger Vinicius Jr is sporting a radically different look after undergoing chin surgery.…

    Moebius retoma ‘Happily Ever After’ antes del estreno en Toronto – Celebrity Land

    July 21, 2026

    Arizona primaries set the stage for contested fall races in a swing state : NPR

    July 21, 2026

    MIL-W vs SRL-W, The Hundred Women’s 2026, Match Prediction: Who will today’s game between MI London and Sunrisers Leeds?

    July 21, 2026
    Tech news by Newsonclick.com
    Top Posts

    Room wants statue in Curacao after record-equalling performance against Ecuador

    June 21, 2026

    Virat Kohli, Jasprit Bumrah return as India name ODI squad for England tour

    June 21, 2026

    sorprende por eficiencia y programación

    July 21, 2026

    Seven ways to make the egg-freezing industry better for women

    June 21, 2026
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    Editors Picks

    Vinicius Jr rocks new look after chin surgery (yes, it’s really him…)

    July 21, 2026

    Moebius retoma ‘Happily Ever After’ antes del estreno en Toronto – Celebrity Land

    July 21, 2026

    Arizona primaries set the stage for contested fall races in a swing state : NPR

    July 21, 2026

    MIL-W vs SRL-W, The Hundred Women’s 2026, Match Prediction: Who will today’s game between MI London and Sunrisers Leeds?

    July 21, 2026
    About Us

    NewsOnClick.com is your reliable source for timely and accurate news. We are committed to delivering unbiased reporting across politics, sports, entertainment, technology, and more. Our mission is to keep you informed with credible, fact-checked content you can trust.

    We're social. Connect with us:

    Facebook X (Twitter) Instagram Pinterest YouTube
    Latest Posts

    Vinicius Jr rocks new look after chin surgery (yes, it’s really him…)

    July 21, 2026

    Moebius retoma ‘Happily Ever After’ antes del estreno en Toronto – Celebrity Land

    July 21, 2026

    Arizona primaries set the stage for contested fall races in a swing state : NPR

    July 21, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Facebook X (Twitter) Instagram Pinterest
    • About Us
    • Editorial Policy
    • Privacy Policy
    • Terms and Conditions
    • Disclaimer
    • Advertise
    • Contact Us
    © 2026 Newsonclick.com || Designed & Powered by ❤️ Trustmomentum.com.

    Type above and press Enter to search. Press Esc to cancel.